Subcontractor bookkeeping has a few problems that don't show up in most small businesses: money the general contractor is holding back until the job's done, invoices tied to a percentage of completion instead of a flat sale, and draw schedules that don't match when cash actually lands. If your books treat retainage like a bad debt or lump draw payments in as regular income, your P&L stops meaning anything.
This isn't exotic accounting. It just requires setting up a few accounts correctly and being consistent about when revenue gets recognized versus when cash shows up. Here's how it should work.
Tracking retainage held separately
When a GC withholds 5% or 10% on an invoice, that money hasn't disappeared and it isn't a loss. It's an asset — a receivable you'll collect once the contract terms are met, usually at substantial completion or final inspection. It needs its own line, typically called "Retainage Receivable," sitting in the asset section of the balance sheet.
The mistake we see most often is subs recording only the net amount they were paid and ignoring the held-back portion entirely. That makes the balance sheet understate what's actually owed to the business, and it makes it easy to lose track of which jobs still have retainage sitting out there six months after the work wrapped up.
The fix is simple: invoice for the full amount, record the full amount as revenue earned, then move the withheld portion to Retainage Receivable instead of showing it as uncollected regular A/R. When it's finally released, you move it from Retainage Receivable to cash. Nothing hits revenue twice, and you can run a report any day of the week showing exactly how much retainage is outstanding and on which jobs.
Progress billing and when revenue actually counts
Most subcontractor contracts aren't billed all at once — they're billed in stages tied to percentage of completion or specific milestones (foundation poured, rough-in done, final walkthrough). The billing schedule and the actual revenue you've earned aren't always the same number, especially if a milestone invoice goes out before or after the matching work is finished.
For tax and internal reporting purposes, revenue should reflect work performed, not just what's been invoiced. If you bill 30% at contract signing but have only completed 20% of the labor and materials, that extra 10% is unearned revenue — a liability, not income, until the work catches up. Overstating income early in a job skews your margins and can leave you owing more in taxes than the job has actually earned yet.
The reverse problem is just as common on long jobs: work gets done but the next progress invoice hasn't gone out. If your books only recognize revenue when you bill, you can go a full month showing a loss on a job that's actually profitable, just because the billing cycle lags the labor. A job-costed P&L, updated as invoices go out and milestones hit, keeps this from distorting your overall numbers.
Matching draw schedules to the bank account
Draws from a GC or a construction loan rarely arrive on a clean schedule. They get held up by inspections, paperwork, or the GC's own cash flow. If your books record income on the date the invoice was issued rather than the date cash lands, your bank balance and your books will drift apart fast — and that gap is exactly where overdrafts and payroll surprises happen on construction jobs.
The practical approach is to track two things side by side: what's been earned and billed (your job-cost revenue) and what's actually hit the bank (your draw receipts). A short weekly or biweekly cash position—draws expected, draws received, retainage outstanding—tells you more about whether you can make next week's payroll than your P&L alone ever will.
It also matters at reconciliation time. A draw that includes retainage withheld, a backcharge for materials, or a lien waiver deduction won't match the original invoice amount dollar for dollar. Someone needs to post the difference to the right place — retainage receivable, a backcharge expense, whatever it actually is — instead of just forcing the deposit to match and letting a stray number sit in an unexplained adjustment account.
Keeping it clean without hiring a full-time controller
None of this requires specialized construction software, though it does require someone who checks the books monthly instead of once a year at tax time. Retainage balances that never clear, draws posted as flat income, and progress billing that doesn't track to actual job status are the three things that make a subcontractor's financials unreliable to a bank, a bonding company, or the owner trying to bid the next job.
At EVO Bookkeeping, every account gets reconciled and every transaction categorized, with a P&L and balance sheet delivered by the second day of the following month, for $199 a month flat. If your retainage and draw tracking has fallen behind, the backlog gets caught up free when you start — or, without a subscription, a one-time catch-up runs $199 per month behind, done within two days, guaranteed in writing. No contracts, cancel anytime, and you can get an instant quote on the site.